Apply for service


    Mason & Kitsap Counties

    The Utility’s installed service connection will include: 1 valve, 1 meter, 1 check valve, and 1 meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates: Metered 3/4″: $19.25/month + usage

    Usage 0-461 cubic feet: $5.90 per 100 cu/ft

    462-1,125 cubic feet: $6.20 per 100 cu/ft

    Over 1,125: $7.50 per 100 cu/ft

    Metered 1″: $32.08/month + usage

    Usage 0-770 cubic feet: $5.90 per 100 cu/ft

    771-1,879 cubic feet: $6.20 per 100 cu/ft

    Over 1,879: $7.50 per 100 cu/ft

    Ready-to-Serve (vacant lots): $19.25/month

    Non-Metered Flat Rate: $51.52/month

    DWSRF Loan Surcharge: $10.10/month

    Sequim- Diamond Point area

    The Utility’s installed service connection will include: 1 valve, 1 meter, 1 check valve, and 1 meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates: Metered 3/4″: $19.25/month + usage

    Usage 0-461 cubic feet: $5.90 per 100 cu/ft

    462-1,125 cubic feet: $6.20 per 100 cu/ft

    Over 1,125: $7.50 per 100 cu/ft

    Metered 1″: $32.08/month + usage

    Usage 0-770 cubic feet: $5.90 per 100 cu/ft

    771-1,879 cubic feet: $6.20 per 100 cu/ft

    Over 1,879: $7.50 per 100 cu/ft

    Ready-to-Serve (vacant lots): $19.25/month

    Non-Metered Flat Rate: $51.52/month

    DWSRF Loan Surcharge: $10.10/month

    Snohomish & Skagit Counties

    The Utility’s installed service connection will include: 1 valve, 1 meter, 1 check valve, and 1 meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates: Metered 3/4″: $43.00/month + usage

    Usage 0-668 cubic feet: $1.30 per 100 cu/ft

    669-1,337 cubic feet: $2.40 per 100 cu/ft

    Over 1,337: $4.00 per 100 cu/ft

    Metered 1″: $71.67/month + usage

    Usage 0-1,114 cubic feet: $1.30 per 100 cu/ft

    1,114-2,228 cubic feet: $2.40 per 100 cu/ft

    Over 2,228: $4.00 per 100 cu/ft

    Ready-to-Serve (vacant lots): $43.00/month

    Non-Metered Flat Rate: $65.90/month

    Non-Metered Flat Rate (Skagit River Colony): $40.00/month

    Oak Harbor- Silver Lake/Polnell Rd area

    The Utility’s installed service connection will include: 1 valve, 1 meter, 1 check valve, and 1 meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates: Metered 3/4″: $43.00/month + usage

    Usage 0-668 cubic feet: $1.30 per 100 cu/ft

    669-1,337 cubic feet: $2.40 per 100 cu/ft

    Over 1,337: $4.00 per 100 cu/ft

    Metered 1″: $71.67/month + usage

    Usage 0-1,114 cubic feet: $1.30 per 100 cu/ft

    1,114-2,228 cubic feet: $2.40 per 100 cu/ft

    Over 2,228: $4.00 per 100 cu/ft

    Ready-to-Serve (vacant lots): $43.00/month

    Non-Metered Flat Rate: $65.90/month

    Non-Metered Flat Rate (Skagit River Colony): $40.00/month

    Oak Harbor- Dugualla Bay/Jones Rd area

    The Utility’s installed service connection will include: 1 valve, 1 meter, 1 check valve, and 1 meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates: Metered 3/4″: $43.00/month + usage

    Usage 0-668 cubic feet: $1.30 per 100 cu/ft

    669-1,337 cubic feet: $2.40 per 100 cu/ft

    Over 1,337: $4.00 per 100 cu/ft

    Metered 1″: $71.67/month + usage

    Usage 0-1,114 cubic feet: $1.30 per 100 cu/ft

    1,114-2,228 cubic feet: $2.40 per 100 cu/ft

    Over 2,228: $4.00 per 100 cu/ft

    Ready-to-Serve (vacant lots): $43.00/month

    Non-Metered Flat Rate: $65.90/month

    Non-Metered Flat Rate (Skagit River Colony): $40.00/month

    Oak Harbor- West Beach/Fort Nugent area

    The Utility’s installed service connection will include: 1 (one) valve, 1 (one) 5/8”x3/4”meter, 1 (one) check valve, and 1
    (one) meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for
    each individual household shall require a separate connection.

    Rates:
    Metered: $29.35/month + usage

    Usage 0-500 cubic feet per month: $2.25 per 100 cubic feet;

    501-1000 cubic feet per month: $3.50 per 100 cubic feet;

    Over 1,001 cubic feet: $4.50 per 100 cubic feet

    Sea View customers in Oak Harbor: 1 cubic foot = 7.48 gallons

    Ready-to-Serve (vacant lots): $29.35/month

    Non-Metered Flat Rate: $47.04/month

    Rates listed are for a standard 5/8” meter size.

    Whidbey Island (all areas except Oak Harbor)

    The Utility’s installed service connection will include: 1 (one) valve, 1 (one) 5/8”x3/4”meter, 1 (one) check valve, and 1
    (one) meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for
    each individual household shall require a separate connection.

    Rates:
    Metered: $29.35/month + usage

    Usage 0-500 cubic feet per month: $2.25 per 100 cubic feet;

    501-1000 cubic feet per month: $3.50 per 100 cubic feet;

    Over 1,001 cubic feet: $4.50 per 100 cubic feet

    Sea View customers in Oak Harbor: 1 cubic foot = 7.48 gallons

    Ready-to-Serve (vacant lots): $29.35/month

    Non-Metered Flat Rate: $47.04/month

    Rates listed are for a standard 5/8” meter size.

    Port Angeles- Monterra area

    The Utility’s installed service connection will include: 1 (one) valve, 1 (one) 5/8”x3/4”meter, 1 (one) check valve, and 1 (one) meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates:

    Metered: $24.00/month + usage

    Usage 0-500 cubic feet per month: $1.00 per 100 cubic feet;

    501-1,275 cubic feet per month: $2.00 per 100 cubic feet;

    Over 1,275 cubic feet: $2.95 per 100 cubic feet.

    Ready-to-Serve (vacant lots): $24.00/month

    Non-Metered Flat Rate: $38.46/month

    Sequim- Kitchen-Dick/Woodcock Rd area

    The Utility’s installed service connection will include: 1 (one) valve, 1 (one) 5/8”x3/4”meter, 1 (one) check valve, and 1 (one) meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates:

    Metered: $24.00/month + usage

    Usage 0-500 cubic feet per month: $1.00 per 100 cubic feet;

    501-1,275 cubic feet per month: $2.00 per 100 cubic feet;

    Over 1,275 cubic feet: $2.95 per 100 cubic feet.

    Ready-to-Serve (vacant lots): $24.00/month

    Non-Metered Flat Rate: $38.46/month

    Port Townsend- Discovery Bay area

    The Utility’s installed service connection will include: 1 (one) valve, 1 (one) 5/8”x3/4”meter, 1 (one) check valve, and 1 (one) meter box. The Customer is responsible for the line from the meter to the Customer’s house. Water service for each individual household shall require a separate connection.

    Rates:
    Residential: (Meter size 5/8” & 3/4”): $46.00/month (includes up to 500 cubic feet)
    Over 500 cubic feet: $1.00 per 100 cubic feet

    Commercial: (Meter size 2”): $65.00/month (includes up to 1,000 cubic feet)
    Over 1,000 cubic feet: $1.00 per 100 cubic feet.

    All rates listed plus state utility tax.


    EmailMailEmail and Paper copy